
Checklist – Change Management Control
A structured checklist to manage design changes, approvals, and impacts without disrupting your construction schedule.
$14.97
Change is inevitable in construction—but unmanaged change is expensive. This checklist gives you a clean, trackable system to control scope changes, document revisions, and client requests without losing visibility or time.
Created for project managers, document controllers, and construction engineers, this checklist walks you through the full change lifecycle—from initial identification to impact assessment, approval routing, and execution tracking. It ensures that no verbal instruction, drawing revision, or scope adjustment goes undocumented.
Each section is carefully designed for field use: log entries, drawing updates, consultant approvals, QA scope adjustments, subcontractor coordination, and even cost impact tracking are all included. Whether you’re running a high-rise build or a tight-turnaround retrofit, this checklist gives you a repeatable process that minimizes rework and dispute risk.
Use it digitally or on paper—it’s formatted for maximum usability in team meetings, audits, and daily coordination.
You’ll Get
1 × High-resolution PDF (8.5 × 11 in, print-ready)
1 × High-resolution PNG (2550 × 3300 px, for digital use)
Instant download, no expiration during access window
Please Note
This is a digital download (no physical item will be shipped). You will receive a download link by email immediately after purchase. Valid for 48 hours. This item is for personal or internal business use only and may not be resold or redistributed.
✔️ 100% safe checkout.
Powered by Hostinger & Stripe.
Instant access after purchase.
📌 This is a digital product.
– One-time download.
– No physical item will be shipped.
– After checkout, you’ll receive an email with your download link (valid for 48 hours).
YOU’LL GET
1 × High-resolution PDF (size: 8.5 in × 11 in, print-ready, black & white)
1 × High-resolution PNG (2550 px × 3300 px for tablet/screens)
Instant download, no expiration during access window
🔒 For personal or internal business use only. Redistribution, resale, or sharing of this file is not permitted.